Principal Investigator:Andrew, Leon Licensed Year(s):20242023
2022
Summary:
This licence has been issued for the scientific research application No.5049.
This project will explore Dene and Me´tis knowledge about the cumulative impacts (CI) of a century of petroleum operations at Norman Wells and downstream, supporting meaningful Indigenous contributions to decisions about closure and reclamation, strengthening Indigenous stewardship roles, and providing education and t...
Principal Investigator:Heck, Darren M Licensed Year(s):
2013
2012 Summary:
The objectives of this project are:
a) Inventory of historical and ecological resources in the area;
b) past, present and future uses of the area by community residents;
c) identification of potential impacts of use of the land use areas supporting access and maintenance (i.e. camps, trails, buffer areas and work areas); and
d) provide follow-up mechanism for on-going communication of issues i...
Principal Investigator:Elliott, Milissa A Licensed Year(s):
2008
Summary:
This project seeks to identify and measure specific characteristics of plants to determine the current baseline conditions of the vegetation, collect grass samples to test for different species of fungi and integrate traditional knowledge of environmental systems with current biological sampling.
Transects (a long straight line) will be measured out from the edge of a road to about 1 km away fr...
Principal Investigator:Pawluk, Rick D Licensed Year(s):2008
2007
Summary:
The research is led by Imperial Oil, and planned and executed by local community organizations and researchers. AMEC will coordinate the research with the Yamoga Land Corporation responsible for gathering the Traditional Knowledge (TK). Local researchers will be hired to undertake study tasks.
A Traditional Knowledge Working Group will be established in Fort Good Hope to provide guidance, deter...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The vegetation component of the 2002 baseline studies will focus on completion of the vegetation typing surveys. Initially, a reconnaissance flight will be required over Sahtu Private Lands along the study corridor. This flight will be used to identify sites for detailed sampling. Sites will be selected to represent the major ecological land units. Where possible, sample sites will be grouped to...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Sahtu Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations fo...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...
Principal Investigator:Bush, Dana Licensed Year(s):
2001
Summary:
The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sampling sites will be located on Crown Land contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, veh...