3 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2002 Aquatic Studies: Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...


Summer 2001 Hydrology Surveys Within the Sahtu Settlement Region: Biophysical Baseline Studies in Support of the Mackenzie Delta Gas Feasibility Study
Principal Investigator: Sawetsky, Les
Licensed Year(s): 2001
Summary: A detailed data collection program will be undertaken on all major streams in the proposed pipeline corridor. The proposed survey will begin in mid-September and continue until late December, 2001 and will consist of comprehensive studies at selected streams, as discussed below, to define how the streams behave and how they change in time. The focus of the hydrology component is on describing h...


Licence #1824
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1975
Summary: Measurement of peak stream flows and assessment of environmental conditions at stream crossings along the Mackenzie Highway....


TOTAL PAGES: 1