2 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 Biophysical and Reconnaissance Studies in the Sahtu Settlement Area
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


Licence #2623
Principal Investigator: McLeod, Curtis
Licensed Year(s): 1980
Summary: To document fish use of shalllow side-channel areas or river margins and to estimate the effect of water level changes on fish habitat. Detailed physical data collection (water levels, velocity and sediment samples) will be undertaken, data will also be collected of fish and small invertebrate use of habitat....


TOTAL PAGES: 1