Principal Investigator:Ponsford, Ian Licensed Year(s):
2024
Summary:
This licence has been issued for the scientific research application No. 5693.
The objective of this research project is to collect baseline data related to the water quality and fish habitat in Dale Creek. The research team intends to accomplish this goal through monitoring and sampling of the water at the watercourse crossing at Dale Creek.
A stream survey, including stream width/depth mea...
Principal Investigator:Chiperzak, Doug Licensed Year(s):
2020
Summary:
This licence has been issued for the scientific research application No.4822.
The goal is to collect baseline fish and fish habitat data for two sections of the proposed Mackenzie Valley Highway; Prohibition Creek Access Road (PCAR) and Mount Gadet Access Road (MGAR). Data collected will support engineering design and regulatory process to construct these segments of the highway.
A desktop s...
Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2011
2010 Summary:
The main objective of the program is to collect fisheries and environmental baseline information to better understand the environmental characteristics of the Great Bear River and to support potential future development of hydropower on the Great Bear River. The program is not being conducted to support a specific project as there are no hydropower projects planned for the Great Bear River at thi...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. All of the aquatic studies will be conducted by three- or four-person crews supported by helicopter, or if possible, by boat. Each crew will include a local assistant. T...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...
Principal Investigator:Collard, Tod Licensed Year(s):
2001
Summary:
The proposed field research program on lands located within the Sahtu Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as ap...
Principal Investigator:Machtans, Hillary Licensed Year(s):
1999
Summary:
The proposed field program is designed to provide information on fish habitat and wildlife in the area of three exploratory petroleum well sites and along their respective access routes in the Fort Liard/Nahanni Butte area. Researchers will travel to the well sites and along access routes sites by helicopter with survey work carried out by air, small boat and on foot. Fish habitat and water quali...