Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Nichol, Susan L. Licensed Year(s):
2005
Summary:
The objective is to improve knowledge about landslides in the Mackenzie Valley. The results of this study will enable better environmental impact assessments and help to reduce environmental impacts related to the construction and operation of the proposed Mackenzie Valley pipeline. As well, the results will have a broader application to a wide range of future development activities in the region....
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area.
During the flights, locations of important land features will be confirmed by Global...
Principal Investigator:Povey, Andrew Licensed Year(s):2004
2003
Summary:
Surveys of selected streams and lakes along the proposed pipeline corridor within the Sahtu Settlement Area will be conducted this winter. This will be done to assess overwintering conditions for fish and watercourse freezing conditions in the vicinity...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...