3 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Combined Phase I/II ESAs for Five Sites
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2010
Summary: The objective of this study is to complete detailed site investigations at each location (5 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will follo...


Fish Habitat Creation Study, Lutsel K'e and Deline, NWT
Principal Investigator: d'Entremont, Marc
Licensed Year(s): 2004
Summary: The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...


Environmental Assessment of the Hamlet of Tuktoyaktuk Solid Waste Disposal Area, Saw Mill Bay and Cape Parry, and cleanup of a former DEW Line site, BAR-3 Tuktoyaktuk.
Principal Investigator: Reimer, Ken
Licensed Year(s): 1996
Summary: The Environmental Science Group (ESG) has been requested by DND and NWSO to conduct environmental investigations of former DEW Line sites and other military bases in the NWT. Personnel will collect soil, plant, water, paint chips and insulating material for analysis of potential contaminants....


TOTAL PAGES: 1