Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several biophysical and engineering studies on the feasibility of a pipeline in the Mackenzie Valley have been conducted, and will continue in 2007. Local knowledge, scientific research, and existing technical information are being used to develop a knowledge base for environmental protection plans, engineering design and regulatory processes.
Route and site reconnaissance will be performed by...
Principal Investigator:Kershaw, G. Peter Licensed Year(s):2002200120001999
1998
19971996199519941993 Summary:
The main study objectives are to: 1) determine the status of permafrost landforms in the study area, and 2) determine long-term recovery after abandonment of the CANOL No. 1 project. Access during the summer is via the Yukon along the Canol Road through Macmillan Pass. Beyond the base camp mountain bikes and foot will be the means of transport. Automated microclimate stations powered by solar ene...
Principal Investigator:Gill, Don Licensed Year(s):
1979
Summary:
To collect samples of soil and vegetation to assess the ecological importance of the spring flood and downstream importance of hydroelectric developments....