Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Smith, Lisa Licensed Year(s):
2002
Summary:
There are three primary objectives of the study; 1) growth and yield information to assess the rate of forest growth and determine current and potential yield of various forest types; 2) NWT cumulative impact monitoring for the Western NWT Biophysical St...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...