6 record(s) found in the location "Sahtu Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

MacTung Project Environmental Baseline Studies
Principal Investigator: Hoos, Rick
Licensed Year(s): 2007 2006
Summary: The purpose of the MacTung 2006 Environmental Baseline Studies is to collect additional information regarding meteorology, hydrology, aquatic resources, vegetation, terrain and wildlife in the MacTung Project area. This baseline environmental information is required to complete the environmental assessment and regulatory applications for approval of the proposed MacTung Mine project. Overland t...


2005 Terrestrial Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: During this study, activities conducted will include vegetation mapping, rare plant surveys, rare plant mitigation planning, timber cruising, and landform, soil and permafrost investigations. Vegetation mapping surveys will consist of visual observations from a helicopter to confirm vegetation types for mapping. These surveys will be conducted in conjuction with rare plant surveys. Sampling equi...


Fish Habitat Creation Study, Lutsel K'e and Deline, NWT
Principal Investigator: d'Entremont, Marc
Licensed Year(s): 2004
Summary: The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...


Preliminary Reconnaissance of Wildlife and Vegetation of the Proposed Sahyoue/Edacho National Historic Park, Edacho Portion, Great Bear Lake, NT.
Principal Investigator: Moore, Steve M
Licensed Year(s): 2002 2001 2000
Summary: This study will gather baseline information on wildlife and vegetation to help fulfill step 5 of the protected areas strategy process. Two people (Steve Moore and one guide from Deline) will travel by boat from Deline to Edacho Peninsula and spend six days collecting baseline information on wildlife and ecosystem units. Thirty-six sites will be assessed and classified to ecosystem type. For eac...


Grey Wolf Norman Wells Drilling Project
Principal Investigator: Melton, Derek
Licensed Year(s): 1998
Summary: Golder Associates was contracted on behalf of Grey Wolf Exploration to conduct preliminary baseline studies at Grey Wolf's proposed well sites. The objective of this study is to determine the presence or absence of fish and wildlife in the vicinity of the proposed project site. A literature search for registered archaeological sites within the proposed site is also planned. Golder Associates was c...


Licence #2669
Principal Investigator: Murray, Bruce
Licensed Year(s): 1981
Summary: To continue biophysical baseline studies associated with the development of the mine property> Samples of fish, benthis invertebrates, bottom sediments will be collected along with water quality studies undertaken....