Principal Investigator:Mochnacz, Neil Licensed Year(s):
2006
Summary:
The Mackenzie Gas Pipeline will cross more than 600 tributaries of the Mackenzie River, ranging from small (< 1 m) vegetated swales to large rivers. All construction methods, with the exception of trenchless drilling, will disturb the bed and banks of the rivers they cross. Fish habitat use and distribution has not been studied in sufficient detail.
Fish will be captured and identified for spec...