Principal Investigator:Bekhuys, Tim Licensed Year(s):2006
2005
Summary:
De Beers Canada has conducted a number of baseline studies in the Gahcho Kue' area, and is continuing these studies in 2005. AMEC Earth and Environmental will be doing the baseline studies on behalf of De Beers. The studies will consist of wildlife, fi...
Principal Investigator:Robinson, Cindy Licensed Year(s):
2004
Summary:
This fieldwork is for reclamation planning at the Tundra Mine site. An aquatic survey will be conducted to characterize the current conditions of water bodies adjacent to the Tundra Mine and downstream of the mine's two tailings ponds. A total of seven l...