Principal Investigator:Maric, Robert Licensed Year(s):
2001
Summary:
The research team will be based out of Yellowknife. Travel to the Ekati Mine site will be by helicopter; travel on site will be on foot. The research team will be in the field for approximately seven days. Characterization of the hydrologic balance of the system under investigation will be completed by the collection of several hundred water samples (each with an approximate volume of 30 ml) at d...
Principal Investigator:Kalich, Laura Licensed Year(s):
1996
Summary:
The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...