Principal Investigator:Pehrsson, Sally J Licensed Year(s):
1996
19951994 Summary:
This will be the final summer of work for this phase of mapping in Indin Lake. The mapping data (including structural, petrological, geochemical &geochronological) will enable a detailed geological history of the project area to be constructed. This will include timing of major events, including volcanism, plutonism and sedimentation, and subsequent deformation. The results will be presented in...
Principal Investigator:Johnstone, Robert Licensed Year(s):19941993
1992
1991 Summary:
The researcher and his team will traverse throughout the map area examining bedrock exposures and sampling. Observations may help construct a geological map showing lithology, structure and mineral occurences. Rock samples will be collected for geochemical and petrological analysis. The results of the survey will be presented in the form of poster displays, talks, reports and a map for distribu...