5 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Fisheries Studies For 2002 Aquatic Effects Monitoring Program
Principal Investigator: Landry, Francois
Licensed Year(s): 2002
Summary: The field work is intended to provide baseline fisheries data for four lakes (Horseshoe, Toss, Fay and Logan) and to obtain post-baseline fisheries data on eight lakes (Vulture, Kodiak, Nema, Cujo, Nanuq, Counts, and Slipper) within the Ekati claimblock...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


Sable and Two-Rock Lake Fish-Out
Principal Investigator: Armstrong, Allison
Licensed Year(s): 2002 2001
Summary: The objective of the fish-out is to provide scientifically defensible data to: (1) quantify fish production, fish habitat and productivity of the intermediate trophic levels (primary and secondary producers); (2) establish linkages between fish habitat and fish productivity in Sable and Two-Rock Lakes; (3) establish a reference database through which comparisons among lakes can be conducted; and (...


Fish Habitat Compensation Monitoring Program - Highway #3, Stagg River
Principal Investigator: Moore, Peter
Licensed Year(s): 2001 2000
Summary: This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...


2000 Panda Diversion Channel Monitoring Program
Principal Investigator: Thomas, Craig J
Licensed Year(s): 2003 2002 2001 2000 1999 1998
Summary: The project will look at the effectiveness of created fish habitat within the on-site Panda Diversion Channel. Assessments will include fish use, invertebrate use, stability and function of habitat structures. These will be monitored on a seasonal and yearly basis. Assessments will include the collection of fish (all to be released live), invertebrates, periphytons, and flow monitoring. Standard...


TOTAL PAGES: 1