5 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Ekati Diamond Mine
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5107. The main objectives of the field work for 2022 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality, and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4886. The main objectives of the field work for 2021 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Ecological Conditions in the Proposed Discharge Route of the Colomac Mine, NT
Principal Investigator: McGurk, Michael
Licensed Year(s): 2005 2004
Summary: The researchers will measure water quality, aquatic ecology and the status of fish populations in ponds and lakes along the proposed discharge route of mine water from the Colomac Mine (North Pond, L-Shaped Lake, Paddle Lake, Lake 315, and Lower Lake) and compare those data with data collected from reference lakes (Steeves Lake, Baton Lake, and Spanner Lake). Work will include taking three samples...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licensed Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Taltson River Hydro Power Supply to Snap Lake Diamond Mine Environmental Baseline Studies
Principal Investigator: Sharpe, Seßn
Licensed Year(s): 2003
Summary: This work will assess the possible effects of expanding the Taltson hydroelectric generation facilities to supply power to the Snap Lake Diamond Mine. The existing facilities are on the Taltson River at Twin Gorges, located approximately 60 km NE of Fort...


TOTAL PAGES: 1