9 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2023 Tłı̨chǫ Highway Crossing Flow Monitoring
Principal Investigator: Baldwin, Blair E
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No. 5602. Collect instantaneous flow rates at the Duport and James River crossing locations. Flow discharge monitoring will be collected at the two identified crossing locations following the manual quantitative stream discharge protocol as described in Section 4: Module 5 of the Ontario Stream Assessment Protocol (OSAP 20...


Electric Vehicle and Smart Heating Opportunities in Yukon and NWT
Principal Investigator: Collier, Joe
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No.5529. The objective is to identify these technical obstacles within specific neighborhoods that anticipate high rates of EV and smart heating unit adoption. We will model these neighborhoods in high detail and present our stakeholders with a suite of possible solutions to any encountered challenges. The Yukon portion of ...


Wekweètì Wind and Solar Resource Assessment Monitoring Campaign
Principal Investigator: Schwarz, David
Licensed Year(s): 2024 2023
Summary: This licence has been issued for the scientific research application No.5430. The objectives of this project are to conduct a wind and solar resource assessment monitoring campaign at the Northland Utilities site in Wekweètì. Lidar has emerged as a powerful tool to remotely sense wind characteristics via measurement of the Doppler shift of light emitted by the lidar and scattered back from p...


Wind Energy Monitoring at Snare Hill
Principal Investigator: Gall, Patrick N.
Licensed Year(s): 2022 2021 2020 2019 2018
Summary: This licence has been issued for the scientific research application No.5159. The objective of this wind monitoring proposal is to continue to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) until the site is next serviced and the equipment removed. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instru...


Wind Energy Monitoring at Yellowknife (2015-2017)
Principal Investigator: Trimble, Annika EV
Licensed Year(s): 2017 2016 2015
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...


Delivery System For Pre-Engineered Manufactured Self-Sustaining (PEMaSS) Housing To Remote Regions
Principal Investigator: Thirunavukarasu, Asok
Licensed Year(s): 2015
Summary: The objective of this research is to identify current state of housing in Yellowknife. This field research should give insights on window-wall ratio, window type, typical R-values, typical construction assemblies, mechanical systems used and delivery process for housing. This will help benchmark the current energy and future performance of housing in the region. As well, the objective of this fiel...


Enhanced Sewage Treatment Using Aeration Technology
Principal Investigator: Bujold, Ron
Licensed Year(s): 2006 2005
Summary: Sewage and wastewater treatment can be expensive and problematic in northern communities. Technology hitherto untried in the North will be tested to determine efficiency and the potential benefits to northern communities in terms of reduced economic burden and increased environmental benefits. Samples will be collected from the Rae and Edzo wastewater treatment facilities for baseline informati...


Architecture and Construction Technique in the North
Principal Investigator: Nadji, Kayhan
Licensed Year(s): 1992 1991
Summary: The Researcher will continue to investigate the relationship between the architectural and technical aspects of buildings and severe northern climate....


Licence #1975
Principal Investigator: Martin, Miss Linda
Licensed Year(s): 1976
Summary: To map non-legal land and resource use along a 28 km. Pipeline corridor in the Mackenzie Delta. Information to be gathered from Yellowknife government officials (i.e. archaeological sites, etc.)...


TOTAL PAGES: 1