2 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Mapping, monitoring and modelling permafrost change in the NWT
Principal Investigator: Kokelj, Steve V
Licensed Year(s): 2024 2023 2022 2021
Summary: This licence has been issued for the scientific research application No.5473. The primary objectives of this research are: 1) to develop and test new methods of characterizing permafrost and monitoring permafrost landscape change with a focus on the Beaufort Delta, central Mackenzie Valley and North Slave regions; 2) mapping sensitive permafrost terrain across NWT by integrating expert assessme...


Characterization of recent permafrost landslides and ground ice distribution in the central Mackenzie Valley, NWT
Principal Investigator: Froese, Duane G
Licensed Year(s): 2024 2023 2022 2021
Summary: This licence has been issued for the scientific research application No.5423. This work builds on studies over the last several years, including field work in the Mackenzie River valley in 2018 and 2019. The objective of 2021 fieldwork is twofold: 1) characterizing a large suite of retrogressive thaw slumps and thaw-induced landslides in the Redstone, Keele, and Johnson River basins that have i...


TOTAL PAGES: 1