Principal Investigator:Dares, Matthew J Licensed Year(s):2020
2019
2018 Summary:
The objective of this wind monitoring proposal is to develop further insight into the wind energy potential for the economic feasibility of building a wind farm in Norman Wells, a remote community that is dependent on gas-electric generation.
A 60 m meteorological tower will be installed in September 2018. This tower is equipped with both heated and unheated anemometers and wind vanes at 40 m, ...
Principal Investigator:Seccombe-Hett, Pippa Licensed Year(s):20102009
2008
2007 Summary:
The objective of this proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells.
This project will involve a site inspection, installation of wind tower and wind monitoring equipment (a 50m tower with 6 calibrated anemometers positioned at 10m, 20m, 30m, 40m and two at 50m level, a wind vane and temperature sensors), and data collecti...