2 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Devon Tuk 2 Gas Development 2006 Field Assessment Program
Principal Investigator: Chiperzak, Doug
Licensed Year(s): 2006
Summary: Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik. The field assessment will involve four s...


Biophysical Study-Inuvialuit Settlement Region
Principal Investigator: Komers, Petr
Licensed Year(s): 2001
Summary: Eleven plant species of national significance are found in the Mackenzie Delta. Following a preliminary classification using satellite images, the presence or absence of these species within sample areas will be determined during field surveys. After field data are collected, a more refined landscape classification model will be produced. To refine and test this model, 30 sites per vegetation com...


TOTAL PAGES: 1