52 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Lukas-Amulung, Sandra E Licensed Year(s):
2008
Summary:
The objectives of this research are to: describe the problematic overlap between NWT environmental assessment (EA) and negotiated agreements (NA); prepare several project review process models to explore possible relationships between NA and EA; evaluate the models and select a preferred model during an expert workshop; and assess the suitability of the preferred model using the views of First Nat...
Principal Investigator:Miller, Glenn D Licensed Year(s):
2008
Summary:
The objective of this research is to identify and document valued vegetation components in the vicinity of proposed winter activities. Each selected site will be assessed for important vegetation components, such as the potential for: rare plants and vegetation communities. The research will include photo documentation and visual observations to characterize each site for vegetation features. Inf...
Principal Investigator:Fitzpatrick, Patricia Licensed Year(s):
2008
Summary:
The purpose of this research is to understand how different environmental assessment (EA) processes across Canada are harmonized, and how harmonization impacts public participation. The Mackenzie Gas Project is the most complex assessment in this regard, makes an ideal study model of EA.
The first objective of this research, that has already been completed, involves documenting the frequency of...
Principal Investigator:Gowman, Joel A Licensed Year(s):
2008
Summary:
The research is focused on accelerating the remediation of Federal Contaminated Sites Action Program (FCSAP) on Victoria Island. The research focuses on determining the remaining risks at the sites and developing a plan to address those risks. There will be an environmental site assessment which involves the collection of soil, sediment, water, and materials (a detailed explanation of the sampl...
Principal Investigator:Seccombe-Hett, Pippa Licensed Year(s):
2008
Summary:
The objectives of the sump monitoring activities are to gain further knowledge of long-term sump integrity and sump monitoring techniques while addressing both the commitments of the Mallik Gas Hydrate Project and the recommendations from site surveys.
Active layer depth will be measured to determine differences between sumps and undisturbed areas. Ground temperature will be recorded. Ground co...
Principal Investigator:Berry, Dan Licensed Year(s):
2007
Summary:
The purpose of the Unipkat I-22 Phase II Environmental Site Assessment is to identify contaminates and their concentrations, as well as to delineate the extent of any contamination at this historic drilling sump site.
The Unipkat I-22 Phase II ESA is designed to gain the maximum amount of site data. Potential contaminants of concern will be identified during the historical file review, but it i...
Principal Investigator:Sampson, Jack Licensed Year(s):
2007
Summary:
The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...
Principal Investigator:Borsy, Emily Jane E Licensed Year(s):2008
2007
Summary:
The objective of this research is to obtain primary information about the gravel situation in the ISR from a variety of industry perspectives. The researchers wish to fill in a gap in information linking supply and demand to community stress and vulnerability, obtaining this information through interviews with industry professionals.
The research will be conducted in two stages. The first sta...
Principal Investigator:Chiperzak, Doug Licensed Year(s):
2006
Summary:
Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik.
The field assessment will involve four s...
Principal Investigator:Seligman, Ben Licensed Year(s):2007
2006
Summary:
Helicopter flights will take place for site reconnaissance in the Niglintgak field area. The surveys will locate various features with GPS, photographs, and video, including land near major water courses, unique features (e.g. patterned ground), and problem areas. Re-survey of existing lease boundaries at Camp Farewell will be done. Optimal sites for infrastructure and water resources will be dete...