2 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Aurora Research Institute Mallik 2L-38 and 3L/4L/5L-38 Sump Monitoring and Retrofit Program
Principal Investigator: Seccombe-Hett, Pippa
Licensed Year(s): 2008
Summary: The objectives of the sump monitoring activities are to gain further knowledge of long-term sump integrity and sump monitoring techniques while addressing both the commitments of the Mallik Gas Hydrate Project and the recommendations from site surveys. Active layer depth will be measured to determine differences between sumps and undisturbed areas. Ground temperature will be recorded. Ground co...


Environmental conditions at abandoned drilling mud-sumps in the Kendall Island Bird Sanctuary, Mackenzie Delta Region
Principal Investigator: Kokelj, Steven V
Licensed Year(s): 2006 2005
Summary: Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...


TOTAL PAGES: 1