Principal Investigator:Edinger, Evan N Licensed Year(s):
2005
Summary:
Climate change is affecting coastlines and coastal communities across Arctic Canada. Communities in the Western Arctic, including Sachs Harbour, have described a variety of effects, including warmer temperatures, reduced sea ice thickness, longer duration of open water in summer, increased wave activity, and new or early arrivals of migratory animals. These effects can have a variety of impacts ...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Gyselman, Eric Licensed Year(s):
2004
Summary:
The development of oil and gas in the Mackenzie Delta and Mackenzie Valley will require additional seismic surveying to refine the location and extent of reserves. One method that has been proposed is the use of airgun arrays towed behind survey ships in...
Principal Investigator:Hannay, David Licensed Year(s):
2003
Summary:
This study is designed to assess the reaction of 4 northern freshwater fish species (Lake trout, Northern Pike, Lake whitefish and Inconnu) to underwater sound and light. Sound signals and strobe lights are commonly used to keep fish away from locations...
Principal Investigator:Cobb, Don Licensed Year(s):
2003
Summary:
The objective of this study is to conduct index gillnetting during the open water season in order to understand species abundance and health of fish from selected locations in the Mackenzie estuary. This study is part of the Tariuq program, which was in...
Principal Investigator:Jalkotzy, Peter Licensed Year(s):
2001
2000 Summary:
Selection of lakes for this program was based on: size (diameter/depth); fish over-wintering potential; connectivity with other waterbodies; and the likelihood of intensive (3D) seismic activity occurring within the lakes during the winter of 2001-02. A total of 6 lakes have been identified for inclusion in the survey. Three alternate lakes have also been identified in the event that those selec...
Principal Investigator:Monita, Darwin Licensed Year(s):
2001
Summary:
The aquatic assessment is scheduled for September and October, 2001, and will focus on three lakes in the Chevron Canada Resources 2001/2002 seismic program areas in the Ellice 3-D, Mallik 3-D and Ogruknang 3-D blocks. All lakes examined will exceed 400m in width. No field camps will be used, all garbage will be packed out, and all human waste buried. The field crew will include a senior fisheri...
Principal Investigator:Collard, Tod Licensed Year(s):
2001
Summary:
The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use of selected delta lakes. The selection of the lakes to study will be determined during the reconnaissance level survey and will largely be driven by their proximity to the production field, the gathering system and pipeline corridor. Additional water quality information will be collected at ten of the selected ...