4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Hawkins, Jim R. Licensed Year(s):
2007
Summary:
Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008.
Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...
Principal Investigator:Kanigan, Julian Licensed Year(s):
2007
2006 Summary:
An understanding of near-surface ground temperatures will provide a baseline to assess change and identify sensitive areas. The objective of this project is to determine the variation of near-surface ground temperatures within the Mackenzie Delta. Investigations have identified four spruce forest communities in the delta based on composition: spruce-alder-bearberry, spruce-feathermoss, spruce-crow...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...
Principal Investigator:Green, Jeff Licensed Year(s):
2001
Summary:
The research team will conduct water and aquatic, terrestrial and social reconnaissance surveys of the proposed development area. Helicopters will be used, to allow aerial examination of specific sites and, if required, to land for ground inspections (outside sensitive sites identified by the HTCs and archaeological sites identified by information obtained from the Prince of Wales Northern Heri...