5 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Wheeler, Helen Licensed Year(s):2024
2023
2022 Summary:
This licence has been issued for the scientific research application No. 5635.
The objectives are:
To establish the patterns of occupancy of beavers along the Inuvik-Tuk highway.
To establish the patterns of past occupancy of beavers along the Inuvik-Tuk highway.
To coproduce monitoring methods for ongoing beaver monitoring and research with community researchers.
To develop methods for ide...
Principal Investigator:Wheeler, Helen Licensed Year(s):2024
2023
Summary:
This licence has been issued for the scientific research application No. 5640.
Objectives:
To address changing beaver population and the impacts on lakes and streams, fish and
communities and wellbeing, including:
a) research with communities to develop an approach for mapping beaver occupancy using photo, video and drones
b) research in to the impacts of beavers on people
c) research in...
Principal Investigator:Lacelle, Denis Licensed Year(s):
2015
Summary:
Thaw slumps are one of the most dramatic thermokarst features in permafrost regions. The number of thaw slumps on Banks Island has more than tripled in recent decades and it is likely that this change is altering terrestrial and aquatic ecosystems. This multidisciplinary research project investigates the short- (1960s-present day) and long-term (Medieval Warm Period to today) impacts of permafrost...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...