26 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Alaskan Gas Producers Pipeline Team Environmental Studies for the Portion of the Proposed Mackenzie Valley Pipeline Route Within the Gwich'in Settlement Area.
Principal Investigator: Collard, Tod
Licensed Year(s): 2001
Summary: The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...


2001 Fish and Fish Habitat and Water Quality Surveys: Gwich'in Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...


Vegetation Mapping at Tuktuk Nogait National Park
Principal Investigator: Raillard, Martin
Licensed Year(s): 1998
Summary: This project will take place in Tuktuk Nogait National Park in 1998 and 1999. The objective of the project is to map the vegetation of the park. As many areas of the Park as possible will be hiked and the various vegetation communities along the hiking route will be put into one of several classes, and their exact geographical location recorded. Once the field season is over, these various geograp...


Vegetation Survey for the Ikhil Gas Development
Principal Investigator: Sutor, Greg
Licensed Year(s): 1997
Summary: Vegetation communities along the pipeline route and over other parts of the Project area would be provisionally mapped from aerial photographs. A field survey would be undertaken with an emphasis on identifying rare plants. The study area is in the Caribou Hills IBP site 4-9, which was in part proposed because of its rare flora. July is an optimum time for a single survey. Also transect sampling ...


Licence #2682
Principal Investigator: Richardson, W. John
Licensed Year(s): 1981
Summary: To conduct studies to determine the possible effects of oil and gas exploration and development on the behaviour of the bowhead whale....


Licence #1792
Principal Investigator: Railton, John
Licensed Year(s): 1974
Summary: Studies to determine the environmental effects which would result from summer oil exploration activities, Banks Islands, on behalf of Panarctic Oils Limited....


TOTAL PAGES: 3