25 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Blasco, Steve M Licensed Year(s):
1990
Summary:
The amphibious vehicle will be mounted with an echosounder, sidescan sonar, subbottom and seismic profiling equipment to run a test survey along the coast of the Tuktoyaktuk Peninsula. The CCGS NAHIDIK will tow a sidescan sonar system over the seafloor to rerun track lines surveyed in previous years to allow for the detection and measurement of the characteristics of new scours on the seafloor of ...
Principal Investigator:Lewkowicz, Antoni G Licensed Year(s):
1979
Summary:
To measure and monitor the spring and summer run-off and the related erosion processes....
Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
Principal Investigator:Guyomarch, Miss Pascale Licensed Year(s):
1976
Summary:
Geomorphological studies of a reconnaissance nature and will emphasize rock weathering, cliff retreat and permafrost conditions within 10 miles of the townsite....
Principal Investigator:French, Hugh Licensed Year(s):
1976
Summary:
Banks Island: Geomorphological Investigations - ground ice, pingos, mass-wasting and spring runoff will be investigated at sites in the Sachs and Upper Kellett drainage systems. Holman Island: Geomorphological studies will be of a reconnaissance nature and will emphasize rock weathering, cliff retreat and permafrost conditions within 10 miles of townsite....