BAR-C - Tununuk - Environmental Site Assessment
Principal Investigator: Gowman, Joel A
Licensed Year(s): 2008
Summary: This license has been issued for the scientific research application #889. The goal of this research is to determine the environmental impacts present at the BAR-C – Tununuk site and to develop estimates of the various waste components (hydrocarbon and metal/PCB impacted soils, non-hazardous materials, and hazardous materials). INAC is focused on accelerating the remediation of contaminated si...


Muskox Mine and Grandroy Mine Exploration Areas - Environmental Site Assessments
Principal Investigator: Gowman, Joel A
Licensed Year(s): 2008
Summary: The research is focused on accelerating the remediation of Federal Contaminated Sites Action Program (FCSAP) on Victoria Island. The research focuses on determining the remaining risks at the sites and developing a plan to address those risks. There will be an environmental site assessment which involves the collection of soil, sediment, water, and materials (a detailed explanation of the sampl...


2007 Tuktoyaktuk Base Camp Decommissioning and Clean-Up
Principal Investigator: Sampson, Jack
Licensed Year(s): 2007
Summary: The purpose of this project at the Tuktoyaktuk Base Camp is to sample soil, surface water and groundwater in the area; sample and characterize materials in Seacans; investigate and characterize landfill waste; investigate soil impact, residual fluids in tanks, and potential historical spill areas – as well as inspect the docks and assess the condition of infrastructure. Imperial Oil intends to dec...


Taglu D-43 Well Site Surficial Clean Up and Sump Assessment; 2007 Taglu G-33 Well Site Surface Clean Up and Sump Assessment; and 2007 Debris Clean Up at Ivik J-26 Well Site
Principal Investigator: Sampson, Jack
Licensed Year(s): 2007
Summary: The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...


Historic Sump Site Assessment
Principal Investigator: Etty, Craig
Licensed Year(s): 2005
Summary: There are three objectives for the evaluation of historic sumps during this project. The first objective is to field verify the "Protocol for the Assessment of Drilling Mud Sumps” for evaluating historic sump site locations. The second objective is to identify, inventory, and assess the environmental conditions at the historic sump sites, and the third objective is to compile consistent data on ...


Delineation of Komokuk Beach (BAR-1), and Nicholson Peninsula (BAR-4).
Principal Investigator: Reimer, Kenneth J.
Licensed Year(s): 1997
Summary: The Environmental Services Group has been requested by Defence Construction Canada and DCLU, to continue conducting environmental investigations of former DEW Line sites. Personnel will collect soil, sediment, plant, water, paintchips and insulation samples from areas of suspected or known contamination. The samples will be analyzed for inorganic elements and PCB's. In addition a small-scale bio...


Environmental Assessment of the Hamlet of Tuktoyaktuk Solid Waste Disposal Area, Saw Mill Bay and Cape Parry, and cleanup of a former DEW Line site, BAR-3 Tuktoyaktuk.
Principal Investigator: Reimer, Ken
Licensed Year(s): 1996
Summary: The Environmental Science Group (ESG) has been requested by DND and NWSO to conduct environmental investigations of former DEW Line sites and other military bases in the NWT. Personnel will collect soil, plant, water, paint chips and insulating material for analysis of potential contaminants....


Preliminary site investigations for the design and cost estimating of the clean up protocol of DEW Line Sites
Principal Investigator: Washuta, A.S.
Licensed Year(s): 1993 1992
Summary: The information gathered at the ten NWT DEW Line Sites will be used to prepare detailed Contract Documents for each site's environmental clean up. During the site visits, the researchers will conduct overall site surveys and identify areas or structures requiring either clean up or demolition. The sites to be visited are Nicholson Pen., Clinton Pt., Cp. Young, Byron Bay, Jenny Lind Isl., Gladman...


Licence #2120
Principal Investigator: Hutchinson, Tom
Licensed Year(s): 1977
Summary: To develop a practical and economic method of revegetation of "difficult" tailings and mine sites in the N.W.T., using acid and metal tolerant vegetation growing naturally at the highly stressed Smoking Hills area of Cape Bathurst, N.W.T....


Licence #1893
Principal Investigator: MacKay, D.
Licensed Year(s): 1975
Summary: To determine how spilled oil behaves and interacts wit the northern environment; how far and how quickly spilled oil will spread on land and in water. To ascertain how low temperatures and snow affect its spread; how deeply oil penetrates into the vegetation, litter or peat and mineral soil layers and what proportion will be lost to evaporation. To provide an indication of the area which would b...