Aurora Research Institute Mallik 2L-38 and 3L/4L/5L-38 Sump Monitoring and Retrofit Program
Principal Investigator: Seccombe-Hett, Pippa
Licensed Year(s): 2008
Summary: The objectives of the sump monitoring activities are to gain further knowledge of long-term sump integrity and sump monitoring techniques while addressing both the commitments of the Mallik Gas Hydrate Project and the recommendations from site surveys. Active layer depth will be measured to determine differences between sumps and undisturbed areas. Ground temperature will be recorded. Ground co...


2006-2008 Aurora-JOGMEC-NRCan Mallik Gas Hydrate Research and Development Project
Principal Investigator: Dallimore, Scott R
Licensed Year(s): 2008 2007 2002 1998
Summary: The objective of this research is to acquire well test data to characterize the properties and concentration of gas hydrates at Mallik. Researchers will collect samples, conduct ground temperature monitoring to evaluate the geothermal regimes controlling gas hydrate stability, and integrate data to better understand gas hydrates in permafrost environments and their potential as a future energy res...


Proposed Unipkat I-22 Phase II Environmental Site Assessment
Principal Investigator: Berry, Dan
Licensed Year(s): 2007
Summary: The purpose of the Unipkat I-22 Phase II Environmental Site Assessment is to identify contaminates and their concentrations, as well as to delineate the extent of any contamination at this historic drilling sump site. The Unipkat I-22 Phase II ESA is designed to gain the maximum amount of site data. Potential contaminants of concern will be identified during the historical file review, but it i...


2007 Tuktoyaktuk Base Camp Decommissioning and Clean-Up
Principal Investigator: Sampson, Jack
Licensed Year(s): 2007
Summary: The purpose of this project at the Tuktoyaktuk Base Camp is to sample soil, surface water and groundwater in the area; sample and characterize materials in Seacans; investigate and characterize landfill waste; investigate soil impact, residual fluids in tanks, and potential historical spill areas – as well as inspect the docks and assess the condition of infrastructure. Imperial Oil intends to dec...


Taglu D-43 Well Site Surficial Clean Up and Sump Assessment; 2007 Taglu G-33 Well Site Surface Clean Up and Sump Assessment; and 2007 Debris Clean Up at Ivik J-26 Well Site
Principal Investigator: Sampson, Jack
Licensed Year(s): 2007
Summary: The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...


Biological Studies of Waters along the Proposed Mackenzie Gas Pipeline Route - Inuvialuit Settlement Region
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2009 2008 2007 2006
Summary: This study is designed to fill science gaps in Environment Canada’s understanding of the structure and functioning of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project. While data collected during the Environmental Impact Assessment studies (carried out in conjunction with the proposed construction and operation of the Mackenzie Gas Pipeline) are relative...


2006 -2007 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Hawkins, Jim R.
Licensed Year(s): 2007
Summary: Several environmental and engineering studies were conducted between 2001 and 2006 to assess a proposed pipeline in the Mackenzie Valley. These studies will continue in 2007 and 2008. Route and site reconnaissance will be by helicopter, and crews will land at selected sites based on observations made during the flight. Reconnaissance surveys of road-water crossings will be performed. Pipeline-...


Shell Canada Limited Niglintgak 2006/2007 Winter Field Program
Principal Investigator: Seligman, Ben
Licensed Year(s): 2007 2006
Summary: The proposed fieldwork is an expansion of previous years' fieldwork to develop a suitable knowledge base for planning and development. In addition, some routine maintenance at Camp Farewell will be conducted. The majority of the proposed work is planned for the Niglintgak area and is focused around the Gas Conditioning Facility (GCF) and the Horizontal Directional Drilling (HDD) crossing site, as ...


Devon Tuk 2 Gas Development 2006 Field Assessment Program
Principal Investigator: Chiperzak, Doug
Licensed Year(s): 2006
Summary: Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik. The field assessment will involve four s...


EnCana Corporation Richards Island 2006 Summer and Fall Field Assessment Program
Principal Investigator: Marken, Sandra L
Licensed Year(s): 2006
Summary: The objective of the study is to determine: the best access for a drilling and development location on Richards Island, which lakes may be suitable for water withdrawal, and geotechnical baseline conditions along a proposed pipeline corridor, proposed gas conditioning facility location, and possible quarry site. The bathymetry program will use a portable zodiac and bathymetry equipment to asses...