2 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Devon Tuk 2 Gas Development 2006 Field Assessment Program
Principal Investigator: Chiperzak, Doug
Licensed Year(s): 2006
Summary: Biophysical and heritage resource surveys will take place in late summer and fall, and contribute to the assessment of a potential development projects (the Tuk 2 M-18 well site and connecting pipeline to Parsons Lake and the Mackenzie Gas Pipeline) located in the Tuktoyaktuk Peninsula, about 12 km southeast of Tuktoyaktuk and 125 km northeast of Inuvik. The field assessment will involve four s...


Environmental conditions at abandoned drilling mud-sumps in the Kendall Island Bird Sanctuary, Mackenzie Delta Region
Principal Investigator: Kokelj, Steven V
Licensed Year(s): 2006 2005
Summary: Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...


TOTAL PAGES: 1