25 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...
Principal Investigator:Salokangas, Raila M Licensed Year(s):
2005
Summary:
The objectives of this study are 1) to gather and analyze views and opinions of the Mackenzie Gas Project (MGP) and its possible impacts on the culture, socio-economics and environment from Gwich’in beneficiaries living in Aklavik, Inuvik, Fort McPherson and Tsiigehtchic, and 2) to distribute this information back to communities.
The field work will be conducted by Raila Salokangas (the resear...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Gwich'in Settlement Area (GSA), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Gwich'in Social and Cultural Institute (GSCI) will conduct the study in the GSA as a subcontractor to the Mackenzie Project Environment Group. The study will proceed under the gui...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Community Corporations in each of Aklavik, Inuvik, and Tuktoyaktuk will be a sub-contractor to the MGP and be responsible for collecting and documenting TK during the project. ...
Principal Investigator:Millman, Pete Licensed Year(s):
2004
Summary:
This project has been initiated as a first step in selecting a pipeline route between the M18 gas discovery and Parsons Lake. While construction of a pipeline from M18 to Parsons Lake will not occur for several years, the LiDAR project will allow Devon t...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
20032002 Summary:
Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This por...
Principal Investigator:Povey, Andrew Licensed Year(s):
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study is for esta...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
2003 Summary:
The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Aerial reconnai...
Principal Investigator:Salokangas, Raila M Licensed Year(s):
2004
Summary:
This study will examine how sustainable development is taken into account in the Mackenzie Gas Project (MGP), with a specific focus on Inuvialuit opinions concerning the Project's environmental and socio-economic impacts. The research will evaluate the p...