15 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Gwich'in Settlement Area (GSA), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Gwich'in Social and Cultural Institute (GSCI) will conduct the study in the GSA as a subcontractor to the Mackenzie Project Environment Group. The study will proceed under the gui...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
This project is a continuation of traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The Community Corporations in each of Aklavik, Inuvik, and Tuktoyaktuk will be a sub-contractor to the MGP and be responsible for collecting and documenting TK during the project. ...
Principal Investigator:Salokangas, Raila M Licensed Year(s):
2004
Summary:
This study will examine how sustainable development is taken into account in the Mackenzie Gas Project (MGP), with a specific focus on Inuvialuit opinions concerning the Project's environmental and socio-economic impacts. The research will evaluate the p...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
These terrestrial studies will include vegetation and soils investigations. The primary goals are to classify vegetation, landforms, soils and permafrost in the project area, to identify locations of rare plants in the project area, and to conduct soil...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
Summary:
Surveys of selected streams and lakes within the gas field development areas at the Taglu, Parsons Lake and Niglintgak lease sites, and along the proposed gathering lines will be conducted this winter to assess overwintering conditions for fish and water...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Povey, Andrew Licensed Year(s):
2002
Summary:
Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Ltd, Shell Canada Ltd, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. This pro...