3 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Environmental Assessment for the Pine Point Mine
Principal Investigator: Mason, Kristine
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4731. To document existing environmental conditions at Pine Point to support upcoming development applications. Hydrology studies include the measurement of selected lake inflow and outflow and stream profile through field surveys, and installation of data loggers to continually monitor lake levels through the open-water...


Taltson Twin Gorges Hydro Generating Facility Aquatic Effects Monitoring Program (AEMP) 2019
Principal Investigator: Miller, Matthew
Licensed Year(s): 2019
Summary: This licence has been issued for the scientific research application No.4565. The objective of this project is to conduct Aquatic Effects Monitoring. This will include three parts: 1) Riparian Habitat and Fish Usage Assessment. This is a study to monitor the trends and fluctuations of the aquatic environment along the riparian zones within the Taltson River from Nonacho Lake to Twin Gorges ...


Thor Lake Beryllium Project Environmental Baseline Study
Principal Investigator: Digel, Mark
Licensed Year(s): 1998 1997
Summary: Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...


TOTAL PAGES: 1