1168 record(s) found in the location "Gwich'in Settlement Area" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator: Licensed Year(s):
2023
202220212020 Summary:
This licence has been issued for the scientific research application No. 5634.
Objectives:
1, To monitor beaver occurrence changes;
2, To assess past beaver occupancy patterns using shrub ring analysis; and,
3, To understand how permanent and transient beaver populations impact their environment.
Activities:
1. Conduct canoe and boat-based visual surveys to map beaver distribution in the...
Principal Investigator: Licensed Year(s):
2023
2022 Summary:
This licence has been issued for the scientific research application No.5613.
The project with investigate impacts of permafrost slumping on water quality, benthic macroinvertebrate communities, fish communities and ecosystem function by advancing research on thaw slumps within the Stony Creek Watershed. The research team will directly collaborate with the Northwest Territories Geological Surve...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5573.
To understand how landscape changes caused by climate warming are impacting aquatic ecosystems, particularly lakes and streams. These disturbances focus primarily on permafrost thaw, in the form of thaw slumps and landslides. The understanding derived will allow better understanding of how water quality and aquatic ha...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5472.
This analysis will seek to provide more detailed insights into recovery supports and services in the Northwest Territories. Through secondary analysis of the data collected during the Addiction Recovery Experiences Survey, The research team will explore the role of social support in addiction recovery, examine whethe...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5568.
The primary objective of this project is to link long-term records of ground temperature and permafrost conditions with changes in landcover and water quality of adjacent ponds and lakes. In other words, how thawing permafrost alters terrestrial and aquatic ecosystem properties.
Along the Mackenzie Valley corridor...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5567.
This project has two primary objectives:
1) To investigate the differences in shrub productivity traits between undisturbed and disturbed tundra sites to better understand the impact of shrub expansion and disturbance on ecosystem function.
2) To investigate the impact of shrub productivity trait differences on deco...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5505.
The objective is to examine the emotional, mental, physical, and spiritual (i.e., holistic) benefits of participating in traditional games for Indigenous youth.
To address two exploratory research questions:
1) How does participation in traditional games contribute to emotional, mental, physical, and spiritual b...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5526.
Objectives:
To explore how leaders collaborate and build successful Indigenous and Industrial Partnerships in the NWT to help Indigenous communities outside of NWT .
To explore the following sub-research questions:
1. Which practices are organizations currently using to build industrial and collaborative relati...
Principal Investigator: Licensed Year(s):
2023
2022 Summary:
This licence has been issued for the scientific research application No.5555.
Our objective is to install 3 Automated Recording Units (ARUs) that will collect daily audio recordings that will allow us to understand how variation in environmental conditions affect habitat use by birds.
To begin, we will temporarily attach 3 ARUs onto 3 trees (using bungee cord or ratchet straps). All birds th...
Principal Investigator: Licensed Year(s):
2023
Summary:
This licence has been issued for the scientific research application No.5580.
The program is intended to assess the integrity of drilling waste sumps and investigate any other identified areas of potential environmental concern (APECs) that might exist at a site. The data will be used to develop a long-term management strategy for environmental liabilities associated with former drilling sites ...