Principal Investigator:Chiperzak, Doug Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5069.
The goal is to conduct a fish and fish habitat assessment at watercourse at Km 40.2 on Dempster Highway.
At the site the fish and fish habitat survey will be conducted at six stream transects established 100 m upstream, 50 m upstream, centerline, 100 m downstream, 200 m downstream, and 300 downstream.
Where poss...
Principal Investigator:Gray, Derek K Licensed Year(s):
2019
20182017 Summary:
The purpose of this project is to obtain baseline data for fish communities in Gwich’in Settlement Area (GSA) and Inuvialuit Settlement Region (ISR) lakes and use these data to predict future changes in fish communities caused by climate change.
Specific objectives are:
1) to develop a baseline data set for fish populations, fish habitat, water quality, and water temperature for small and m...
Principal Investigator:McLeod, Curtis Licensed Year(s):
1980
Summary:
To document fish use of shalllow side-channel areas or river margins and to estimate the effect of water level changes on fish habitat. Detailed physical data collection (water levels, velocity and sediment samples) will be undertaken, data will also be collected of fish and small invertebrate use of habitat....
Principal Investigator:de Graff, Dirk Licensed Year(s):
1979
Summary:
To study the over-wintering areas for fish. The study will include sampling of fish, water, plant life, and bottom sediments for population assessments and habitat analysis....
Principal Investigator:Mann, Gary Licensed Year(s):
1977
Summary:
To conduct a study of water characteristics, fish species, and small water organisms and to inventory physical characteritics (size, width, depth, discharge, and bank conditions) of lakes and streams by ground and aerial surveys....
Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....