Principal Investigator:Nearing, Michelle Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5047.
The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...
Principal Investigator:Johnstone, Robin Licensed Year(s):
1999
Summary:
The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...
Principal Investigator:Machtans, Hillary Licensed Year(s):
1999
Summary:
The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...
Principal Investigator:Digel, Mark Licensed Year(s):1998
1997
Summary:
Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...