3 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2006 Biophysical and Reconnaissance Studies in the Deh Cho Region
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


Environmental Assessment for the Fort Liard Area Seismic, Drilling and Development Project, Fort Liard, NT.
Principal Investigator: Antoine, Don
Licensed Year(s): 2001
Summary: Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...


Fisheries & Vegetation analysis for the Range Oil Fort Liard P66 Pipeline Project
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1998
Summary: Fisheries and vegetation field work will begin in June 1998. Three small streams north of Fort Liard will be surveyed to determine if fish are present or absent and to assess the fish habitat in each creek. Two of these creeks are tributaries to the Liard River and are located near the P66 well site. Fisherman Creek, the tributary draining into Fisherman Lake from the Liard Range will also be surv...


TOTAL PAGES: 1