3 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Assessment of Stream Crossings for Planned Improvements to the Mackenzie Valley Winter Road.
Principal Investigator: Johnstone, Robin
Licensed Year(s): 1999
Summary: The proposed field program is designed to provide site-specific information on stream crossings, for planned improvements to the Mackenzie Valley winter road route. Researchers will travel to the crossing sites by helicopter from the closest community. At each crossing location, habitat assessments, water quality samples and fish census techniques (outlined in the DFO fisheries research permit) m...


Chevron Ft. Liard Potential Routing Selection Program
Principal Investigator: Machtans, Hillary
Licensed Year(s): 1999
Summary: The purpose of this study is to collect information about a variety ecosystems crossed by or in close proximity to the potential routes for a proposed pipeline. Fisheries and water quality studies will involve a survey of fish habitat, and of the water quality of any water bodies allong the proposed routes. Any fish collection will be outlined by Department of Fisheries and Oceans research permits...


Thor Lake Beryllium Project Environmental Baseline Study
Principal Investigator: Digel, Mark
Licensed Year(s): 1998 1997
Summary: Fisheries investigations, including habitat identification and possibly gill netting, will be conducted in the four small lakes located within the watershed of the orebody of the Thor Lake site. In lakes with fish, will collect 10 fish (up to two species) for chemical analysis. Fisheries investigations, including habitat mapping, gill netting (to verify fish community), will be undertaken in the...


TOTAL PAGES: 1