2 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Central Foreland NATMAP Project
Principal Investigator: Lane, Larry S
Licensed Year(s): 2002 2001 2000
Summary: The research team will resume mapping bedrock and surficial geology at 1:50,000 and 1:250,000 scales, continuing a project begun in the summer of 2000. The base of operations will be either at Fort Liard, or at an existing base camp on the southeastern La Biche River. Fly camps will be accessed by helicopter. Fly camps will be visited by 2-4 crew members for about 1 week. From the fly camps the ...


Magnetotelluric survey in northern British Columbia and the Yukon
Principal Investigator: Jones, Alan
Licensed Year(s): 1999
Summary: The objective of the study is to investigate the structure and composition of the earth's crust and upper mantle to depths greater than 60 km in northern British Columbia, NWT and BC. At eight locations along NWT hwy. 7, sensors will be lowered into small (1 m long x 25 cm wide x 25cm deep) holes dug in the ground . These sensors will measure the time variations of the Earth's natural electrical ...


TOTAL PAGES: 1