Principal Investigator:Taylor, James Licensed Year(s):
2001
Summary:
The project team will be based in Ft. Liard, and travel in the field by Deh Cho Helicopters. The itinerary of the field is weather dependant. The duration of the proposed field studies will be from 10 August-26 August, 2001. Rock samples (fist sized) will be collected, and returned to the laboratory for detailed chemical analysis. Structural mapping will be traced on aerial photos and transferre...
Principal Investigator:Lane, Larry S Licensed Year(s):2002
2001
2000 Summary:
The research team will resume mapping bedrock and surficial geology at 1:50,000 and 1:250,000 scales, continuing a project begun in the summer of 2000. The base of operations will be either at Fort Liard, or at an existing base camp on the southeastern La Biche River. Fly camps will be accessed by helicopter. Fly camps will be visited by 2-4 crew members for about 1 week. From the fly camps the ...