Principal Investigator:Katopodis, C. Licensed Year(s):
1977
Summary:
Topographic and hydrometric survey for the design of weirs to assit fish in entering culverts....
Principal Investigator:McKinnon, Greg Licensed Year(s):
1976
Summary:
To assess the short and long term effects of highway construction on the aquatic resources of three streams....
Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
Principal Investigator:Wooley, David R. Licensed Year(s):
1976
Summary:
To carry out aerial reconnaissance studies (locating and counting ungulates) associated with environmental input into pipeline design and location....
Principal Investigator:Davison, D.M. Licensed Year(s):
1975
Summary:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....