2 record(s) found for principal investigator "Moore, Steve" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Inuvik to Tuktoyaktuk Highway Project
Principal Investigator: Moore, Steve M
Licensed Year(s): 2010
Summary: The objectives of this study are to determine the presence of fish and the quality of fish habitat at stream crossings along the proposed road alignment. They will be achieved through observations, measurements, and surveys carried out during freshet. These observations will provide an indication of seasonal habitat use at high water, when connectivity to upstream habitats may exist. Similarly, ...


Environmental Baseline Studies, Tamerlane Ventures Inc., Pine Point Mining Project
Principal Investigator: Moore, Steve M
Licensed Year(s): 2005
Summary: The objective of the field program is to document baseline conditions within the study area to be used for a water licence and land use application towards development of a lead and zinc mine adjacent to the old Pine Point property. This includes completing Ecosystem Classification, Surface Water Quality Sampling, Fish Habitat Assessments, and a Wildlife Utilization and Diversity Study. Field s...


TOTAL PAGES: 1