Click on a tag to filter your results:

topography 
physical sciences 
geology 
ground temperature 
permafrost 
pipeline corridor 

1 record(s) found for principal investigator "Smith, Sharon" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Enhancement of Permafrost Monitoring Network and Collection of Baseline Terrain Information in Mackenzie Valley Corridor, NWT
Principal Investigator: Smith, Sharon S
Licensed Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006
Summary: Forty-four sites will be monitored during the course of the project: four sites in Gwich'in Settlement Area, twenty-two sites in the Sahtu Settlement Area and eighteen sites in the Deh Cho Region. Preferred locations will be chosen near existing highway/winter roads or the existing pipeline, trail and cutlines, for continuous site accessibility and to minimize disturbance to the environment. One o...


TOTAL PAGES: 1