Principal Investigator:Smith, Sharon S Licensed Year(s):202320222021
2020
2019 Summary:
This licence has been issued for the scientific research application No.4639.
The objectives of this project are:
1) to provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and active layer thickness) and improve characterization of terrain sensitivity in the Mackenzie Valley;
2) to monitor ground temperature and active layer to detect changes in pe...
Principal Investigator:Smith, Sharon S Licensed Year(s):201820172016
2015
201420132012201120102009200820072006 Summary:
This project continues the on-going monitoring program of permafrost and collection of baseline terrain information in the Mackenzie Valley Corridor, NWT). This phase of the project is largely data collection.
Objectives are:
• To provide baseline knowledge of permafrost and terrain conditions (specifically ground temperature and permafrost active layer thickness) and improve characterization...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
The Geological Survey of Canada maintains a network of active layer and permafrost temperature monitoring sites in the Mackenzie region in order to document the response of permafrost conditions to climate change. Gaps exist in the network in the permafrost zones north of Norman Wells, the Mackenzie Delta region, and on shorelines and coastlines. Enhancement of the network is essential to provide ...
Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...