Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...