Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The Mackenzie Gas Project has sub-contracted the Fort Simpson Metis to collect and document Traditional Knowledge during the project. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protection plans. The Fort S...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...