Principal Investigator:Dallimore, S.R. Licensed Year(s):
1990
1989 Summary:
The team will drill and sample five 100 meter boreholes along a transect from northern Richards Island to an anomalous permafrost site 25 Km off-shore. In site testing, geophysical and geothermal logging will accompany the drilling. Undisturbed core will be maintained and shipped to the SINT lab in Inuvik for detailed logging, testing and subsampling....