2 record(s) found for principal investigator "Seccombe-Hett, Pippa" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Seccombe-Hett, Pippa Licensed Year(s):20102009
2008
2007 Summary:
The objective of this proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells.
This project will involve a site inspection, installation of wind tower and wind monitoring equipment (a 50m tower with 6 calibrated anemometers positioned at 10m, 20m, 30m, 40m and two at 50m level, a wind vane and temperature sensors), and data collecti...
Principal Investigator:Seccombe-Hett, Pippa Licensed Year(s):2008
2007
Summary:
The objective of this wind monitoring project is to quantify the wind energy potential for the economic feasibility of building a wind farm in Tuktoyaktuk, a remote community that is dependant on diesel-electric generation.
This proposed project will involve four main activities:
1) Consultation with the Hamlet of Tuktoyaktuk to identify the optimum wind turbine location.
New monitoring si...