Principal Investigator:Grabke, Dan Licensed Year(s):
2000
Summary:
In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...