Principal Investigator:Wang, Baolin Licensed Year(s):20082007
2006
Summary:
Year 2 of this four-year project involves detailed mapping of landslides and collection of soil samples. Soil sampling will be carried out by digging shallow test pits with hand tools or by using a small hand-held, gas-operated coring machine. It is estimated that up to six test pits of about 1.5m diameter and about 1.5m deep will be excavated at a site; however, the total number of test pits to b...
Principal Investigator:Wang, Baolin Licensed Year(s):200920082007
2006
Summary:
Year 2 of this four-year project involves detailed mapping of landslides and collection of soil samples. Soil sampling will be carried out by digging shallow test pits with hand tools or by using a small hand-held, gas-operated coring machine. It is estimated that up to six test pits of about 1.5m diameter and about 1.5m deep will be excavated at a site; however, the total number of test pits to b...